To the central content area

111 Yunlin County Water Pollution Source Inspection, Control and Discharge Permit Report Data Management Project

Absrtact
The main purpose of this project is to check the business wastewater treatment facilities and sewage sewer systems, and the legality and rationality of their regular reporting materials and permits. Supervise business and strengthen the publicity of laws and regulations to maximize the effectiveness of waste and sewage treatment facilities. Improve wastewater and sewage pollution through source control and reduce environmental pollution of rivers and water bodies caused by wastewater. Regularly check the water quality of drinking water sources, water distribution points, simple tap water, water purification plant water sources and terminal water dispensers in the county to master the water quality of each drinking water source. At the same time, by reviewing the water supply license of the water filling station, the safety of the county residents in using the water source of the water filling station is guaranteed. Through this project, the document files and computer database of water pollution sources in the county are systematically established, so that the Environmental Protection Bureau can quickly inquire about and control the water pollution within its jurisdiction, and use the established water pollution source control database to conduct control results and reports analysis. Through various control strategies, effectively improve the water quality of rivers in the county. During the project period, a total of 127 on-site inspection operations were completed, and 347 times of business discharge water quality sampling operations were carried out (including the sewage plant in the industrial park and the business with discharge permits in the outlying island industrial park), of which a total of 58 times did not meet the discharge standards requirements. A total of 1329 examinations have been completed for various permit examinations of the business, and a dedicated line service is provided to shorten and improve the examination time. Strengthen the management and early warning management of industrial parks within the jurisdiction, and conduct inspections on the operation of on-site facilities in four industrial parks sewage plants every month, with a total of 40 inspections. 572 sampling points for drinking water and 295 sampling points for drinking water dispensers were carried out within the jurisdiction, and the results of water quality sampling and analysis were all in line with drinking water quality standards. Assisted in emergency response sampling operations 10 times. Participated in 6 water pollution prevention and control promotion related activities and meetings. Completion of 2,188 regular inspection application reports review, of which 2,103 application reports are correct, and the other 85 reports are correct after supplementary review. 100% of the work items of this project have been completed, and the progress of the contract has reached the mid-term report.
Keyword
water pollution, effluent, Discharge Permit
Open
top